Bilim OSGB ana sayfa

Lightning protection risk assessment

Whether your building needs a lightning rod and, if so, which protection level will be sufficient is determined by calculation, not by guesswork. We calculate and report your lightning risk in accordance with the TS EN 62305 standard.

Get a QuoteFrequently asked questions
StandardTS EN 62305 series — lightning risk management and protection levels.
Assessment firstBefore a lightning rod is installed, calculation determines whether it is really needed.
Not to be confused with the installed systemThe annual measurement of an installed lightning rod is a separate service (periodic inspection).

What is a lightning protection risk assessment?

Not every building needs a lightning rod; and where one is needed, just any lightning rod will not do. A lightning protection risk assessment puts the lightning risk into numbers by taking into account your building's location, height and construction, the people and assets inside it, and the lightning density of the area.

If the calculated risk is above the tolerable limit, protection is required, and the protection level (LPL I–IV) that will be sufficient is determined. This level is the basis for the design of the air-termination system (lightning rod), equipotential bonding and surge protection (surge protective devices) to be installed.

We consider the assessment especially important in facilities with a fire and explosion risk: a lightning strike there can damage not only the structure but also the explosive atmosphere. We deliver the report in a form that the electrical engineer who will prepare the design and the inspectors can use.

Before you buy a lightning rod: is it really necessary?
The level is determined by calculation, not by eye.

Who should have it done?

Tall structures, buildings that stand higher than their surroundings, facilities in open areas, and structures containing large numbers of people or high-value assets are at greater risk from lightning. The assessment is particularly important for fuel and LPG facilities, businesses involving chemicals and explosive atmospheres, silos, and electronics- and data-intensive facilities.

Even if you have a lightning rod installed, the risk should be reassessed whenever the structure is altered (an additional storey, a new chimney, equipment on the roof). Only an up-to-date assessment can tell whether the existing protection is still sufficient.

Lightning is twice as dangerous in an explosive atmosphere.
If you have added equipment to the roof, the risk has changed.

Protection levels (LPL)

As a result of the assessment, a protection level is assigned to the structure. The higher the level, the greater the protection system's capacity to intercept and conduct lightning. The level required is determined by the magnitude of the risk and the importance of the structure.

Protection levelDegree of protectionTypical application
LPL IHighestExplosive atmospheres, chemicals, fuel
LPL IIHighHospitals, schools, crowded buildings
LPL III–IVMedium–standardResidential buildings, offices, ordinary workplaces

The table summarises a general approach; each structure's level is determined by its own risk calculation.

What does the service include?

Structure and environment dataDetermining the building's location, dimensions and construction, and the lightning density of the area.
Risk calculationCalculating the risk components in accordance with TS EN 62305-2 and comparing them with the tolerable limit.
Protection level and recommendationsThe required LPL, and recommendations for the air-termination system, equipotential bonding and surge protective devices (SPDs).
ReportA risk assessment report showing the calculations, which the designer and inspectors can use.

Frequently asked questions

Are a risk assessment and a periodic measurement the same thing?

No. The risk assessment determines whether a lightning rod is needed and at which level. Measuring the earthing resistance of an installed lightning rod once a year, on the other hand, is a separate periodic inspection service.

Does every building need a lightning rod?

No. In some structures, the calculated risk remains below the tolerable limit and protection is not mandatory. But an assessment is needed to be able to say so.

When should the assessment be renewed?

The risk should be recalculated when a storey, a chimney or roof equipment is added to the structure, or when its intended use or the value of its contents changes.

Our other services

Explosion Protection Document Periodic Inspections Risk Assessment and Emergency All services

Let's determine your building's lightning risk by calculation.

Get a Quote